Project Highlights

Our experience enables us to execute projects of all sizes for customers
in various markets. Get a sense for the value we bring to our customers.

PROJECT 1

PROJECT 1

Construction & Piping Installation

TankWorx served as the EPC for the balance of plant design, civil construction, fabrication, and installation of loading arm-to-dock connection piping, dock racks, and 7 loading arms.

PROJECT 2

PROJECT 2

New Manufacturing Facility

TankWorx installed complete equipment, including mechanical equipment, for a new gypsum facility. We installed dryers, silos/bolted tanks, board line, conveyors, and elevators. We also fabricated and installed all the project’s structural steel, piping, and hoppers.

PROJECT 3

PROJECT 3

Field Tank Construction & Installation

TankWorx was contracted to engineer, fabricate, and install 7 new field-erected API storage tanks and 2 clarifiers. We also completed all phases of civil construction, electrical/instrumentation, coatings, and testing for the project.

PROJECT 4

PROJECT 4

Plant Expansion

TankWorx assisted in an expansion project in Baton Rouge, LA. We were responsible for the civil, structural, equipment installation, and construction of a high-pressure double-walled API-620 tank.

PROJECT 5

PROJECT 5

Train 1 & 2 Install

TankWorx fabricated and installed more than 14,000 linear feet of piping. The contract’s scope included civil foundations and setting all process equipment, including tanks, vessels, conveyor systems, pumps, grouting, and equipment alignment. We erected the flare stack, installed process tubing, and tested and commissioned the unit.

PROJECT 6

PROJECT 6

Coal Dumper Install

TankWorx demolished an existing coal dumper. We assembled the new railcar dumper in the field with a new structure. The coal dumper weighed 168 tons, and we coordinated all lifts and equipment settings.

PROJECT 7

PROJECT 7

Boiler Re-Tube

We retubed an existing boiler, which included removing and reinstalling 413 tubes on the hot side of the boiler. We had limited access and no entry to the main section of the boiler to remove tubes. Nevertheless, we successfully removed all tubes and inserted new tubes ahead of schedule.

PROJECT 8

PROJECT 8

Internal Coil Replacement

TankWorx completed reactor maintenance during a scheduled turnaround, including head removal, coil and clip replacement, and nozzle sleeve machining and welding. The new coils were installed and secured, the reactor head was realigned and set, and all head bolts were torqued to specification.

CONTACT US

We are here to
help you.

Have a question or need a quote? Give us a call, send an email, or fill out the contact form—we’re here to help and will get back to you promptly.